Pile Driving in Old Havana, Cuba

Without a doubt, one of the most interesting photos Vulcan had in its collection was this one, taken of a Vulcan #0 driving reinforced concrete sheet piles 500 mm x 600 mm x 21.9 m long (20″ x 24″ x 72′) for the New Harbor Wall in Havana, Cuba.  The piles are being driven off of the Cristóbal Colon floating derrick, owned and operated by the contractor, Arellano y Mendoza. The photo is dated 1927.

In addition to its historical value, Vulcan was so taken with this photo that it used a drawn rendering of the photo for the cover of its very first dedicated bulletin to advertise the Warrington-Vulcan Single-Acting hammers, Bulletin 68, shown below.

bulletin-68-cover
Cover for Bulletin 68, showing the Vulcan #0 being used in Havana, Cuba, by Arellano y Mendoza.

 

Advertisements

One thought on “Pile Driving in Old Havana, Cuba

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.