Goodrich (1908): The First Instrumented Pile?

The results of the Proctorsville project showed that our understanding of the mechanics of pile driving—and of the load transfer mechanism between pile and soil during and after installation—left a great deal to be desired. The solution to the problem was to instrument the pile driving process. Such an effort was documented in the 1908 … Continue reading Goodrich (1908): The First Instrumented Pile?